  1. Are site inspections performed and ensure all electrical installation must comply with the design specifications, as per drawings and as per applicable standard.
  2. Who coordinates and prepare various documents such as test, inspection reports, excavation permits, safety approval prior to implementation of work?
  3. Who is assigned to assist and coordinate with the sub-contractor to plan co-ordination and control work activities in accordance with approved drawing work method / inspection & specification requirement, etc.,
  4. Who verifies Inspection Readiness before issuing RFI ?
  5. Who ensures the files/Inspection Records always updated
  6. How are discrepancies/anomaly detected during monitoring inspection and documented?
  7. How are Non Conformance Reports (NCR) controlled?
  8. Follow up of corrective and preventive action for NCR/CAR issued and verification of effectiveness of the same.(CAR- Corrective Action Request)
  9. Is prompt action taken to clear inspection log book comments ?
  10. Who submits the daily reports to the QC-Manager at the end of each day of work.
  11. Who reviews design and development of one line diagrams, preparation of electrical equipment specifications, and identification of areas,
  12. Who supervises engineers and draftsmen for underground tunnel construction projects.
  13. Who reviews and updates engineering estimating data, costing parameter and drafting standard.
  14. Who is involved in the preparation of work plans, schedules, budgets, manning requirements and progress reporting.
  15. Who is responsible for operation and maintenance of grid station, Transformers, protection relays, timers, Switch Gears, Panel Boards, Circuit Breakers, HT & LT transmission lines and electrical equipment, Electrical motors A/C & D/C, Industrial trouble shooting & wiring
  16. Are Cable High Potential Test / Insulation Resistance Check/ Continuity Checked?
  17. Is loop Checking, Commissioning & Trouble Shooting performed
  18. Who performs maintenance works on turbines, electrical motors and accessories.
  19. Are modifications of Panel Internal Wiring Connections undertaken as per site requirements?
  20. Who trouble shoots and maintains electrical connections, accessories and installations / equipment’s.
  21. Who undertakes charging & discharging Test; Cable Termination.
  22. Is Cathodic Protection throughout the plant that includes Inlet facilities monitored regularly?
  23. Is review of design and specification related to a project to conform to original client specification undertaken? By whom.
  24. Who performs design modification / revision of wiring of feeders, motors controllers, medium and low voltage wiring and protection circuit?
  25. Who supervises medium and low voltage installation, termination, splicing and jointing and testing of underground cable system?
  26. Does the electrical department assist in start-up, testing and commissioning of systems?
  27. Are electrical/instrument drawings for apparatus and materials, detail drawings updated prior to work implementation? Who prepares and checks them
  28. Who is responsible for the installation of electrical/instrument cable trays, field instruments, analog and digital junction boxes. Panel boards, switchgears, transformers, lighting fixtures, bus duct and its accessories?
  29. Is a site inspection conducted to ensure all electrical installation complies with the design specifications, as per drawings and as per applicable standard?
  30. Who Coordinates and prepares various documents such as test, inspection reports, excavation permits, safety approval prior to implementation of works?
  31. Who verifies Inspection Readiness before issuing RFI
  32. Are files/Inspection Records always updated?
  33. Are all discrepancies/anomalies detected during monitoring inspection reported and reported to the QC Manager.
  34. Who Initiates NCRs?
  35. How is follow up of corrective and preventive action for NCR/CAR issued and verification of effectiveness of the same.(CAR- Corrective Action Request) carried out?
  36. Is immediate remedial action to clear inspection log book comments undertaken?
  37. Are the electrical materials delivered to site in conformance with approved samples, materials and equipment?
  38. Who performs the receipt inspection for electrical materials delivered to site, assures that they are properly stored, and that discrepancies are reported?
  39. Is work supervised per specifications and standards?
  40. Who is responsible for operation and maintenance of grid station, Transformers, protection relays, timers, Switch Gears, Panel Boards, Circuit Breakers, HT & LT transmission lines and electrical equipment, Electrical motors A/C & D/C, Industrial trouble shooting & wiring?
  41. Are Cable High Potential Test / Insulation Resistance Check/ Continuity Check performed?
  42. Installation of Lighting Pole complete with JB and Gearbox fixing, Lighting DB.

    Electrical | Plant Asset Management

    Electrical | Plant Asset Management


 

Other Info

Document Category Engineering
Document Target Users Engineers and technicians

Leave a Reply

Your email address will not be published. Required fields are marked *