Instrumentation | Plant Asset Management

Instrumentation | Plant Asset Management

  1. What Project Quality documents are reviewed prior to instrument inspection?
  2. Who reviews the preliminary design of project for approval?
  3. Who reviews and approves Method Statements/Work Instructions and ITP (Inspection and Test Plan)
  4. Are QC inspections performed and all activities reviewed to ensure that they are in strict compliance with the approved SAUDI ARAMCO Engineering Standards (SAES), SATIP (SAUDI ARAMCO Typical Inspection Plan), Work Instructions and Special Work Procedures.
  5. Are the instrumentation materials delivered to site in conformance with approved samples, materials and equipment?
  6. Who performs the receipt inspection for instrumentation materials delivered to site, assures that they are properly stored, and that discrepancies are reported.
  7. Is damaged property photographed and the condition reported to proper authorities?
  8. Are standard tests conducted on instrumentation equipment & cables and accepted by all interested parties?
  9. Are visual inspections of installations like transformers, electrical and instrumentation panels, cable tray, conduits, cables and its terminations etc. performed?
  10. What is the working relationship with automation and process control specialties assigned to various tasks during testing?
  11. Who carries out the inspection of completed work?
  12. What procedures are used for preparation and clearing of inspections for Exception Item Lists (EIL)?
  13. How are Non Conformance Reports (NCR) controlled?
  14. How is the startup, testing, commissioning and handover of the works monitored?
  15. Are changes proposed where ever necessary?
  16. Who is responsible for ensuring contractors ‘prevent any violation before the fact’ by making routine site visits and maintaining a good relationship with contractor QC and Engineering?
  17. Are necessary guidelines to the workers to improve the quality of work as well as to work safely through “tool box” meetings undertake?.
  18. Are weekly highlights and reports prepared and submitted on routine basis (i.e., monthly,) and are they included in monthly Project Quality Index.

    Instrumentation | Plant Asset Management

    Instrumentation | Plant Asset Management


 

Other Info

Document Category Engineering
Document Target Users

Leave a Reply

Your email address will not be published. Required fields are marked *